top of page
VALENCIA DRAIN REPAIR
Valencia Road Storm Drain Repair
Aptos, CA
-
Temporary bridge install across existing roadway for removal of failed 8’ diameter CMP pipe.
-
Multiple trestles created for drilling and crane work.
-
40’ excavation to bottom of failed culvert using soldier beams, tiebacks, and internal bracing.
-
Install of 30” x 50’ bridge abutment piles for temporary bridge.
-
Erection and install of 100’ span ACROW bridge
-
All CIDH and soldier beam shafts installed with casing through fill material to creek levels.
-
Permanent Anchor and Soil nail wing walls for new concrete culvert install.
Project Team
-
Owner: County of Santa Cruz
-
General Contractor: J.J. Albanese
-
Shoring and Foundations: Case Pacific Company
-
Project Manager: Duane Phares
-
Superintendent: Randy Virdel
-
Designer: SPI Consultants
-
Project Cost: $5.3 Million